15 schemes in our data support this.
₹50,000 – ₹50 Cr
Our estimate₹10,000 – ₹50 L
Official₹2 L – ₹10 L
OfficialThe same business at different sizes. Each one changes what it costs, what you must register, and how it is funded. Bands are planning figures, not quotes.
No guarantee-type scheme is tagged to this opportunity.
Every one of these is another opportunity page with its own money, approvals and pathways — keep walking the chain as far as it goes.
Nothing mapped yet.
We show gaps rather than guesses. Every figure above either cites an official source or says where it came from.
Highlighted papers are required by at least one scheme.
Implementing departments are not linked to these schemes yet.
No bank products are linked to this opportunity yet — bank intelligence is not ingested.
Run as one business around Solar, Electric Vehicles brings better buyers — 18 schemes across the 2 opportunities together, against 15 for Solar alone.
Decide which version of this business you are building
This opportunity splits into 3 distinct businesss: Rooftop solar for own use · Solar pump for irrigation · Grid-connected solar plant. They carry different investment bands and different approvals, so this choice decides which schemes and which numbers apply to you.
Get the registrations every application asks for
Aadhaar — UIDAI (Before applying) · PAN — Income Tax Dept (Before applying) · Bank account — Any scheduled bank (Before applying) · Udyam registration — Ministry of MSME (To register the enterprise). The bracket is each authority's own wording on when it is needed — we hold no processing times for any of them.
Collect the documents these schemes ask for
60 documents appear across this opportunity's schemes; 60 of them are marked mandatory: Aadhaar card, Bank account details, Caste certificate, Income certificate, Loan sanction letter, Quotation from supplier, Self-declaration / affidavit, Active mobile no, Admission letter, Application (submitted in bidding process) (implied through application process), Application form, Authorization letter, Contracts, purchase order or other relevant supporting document as proof of set up solar power generation unit, Copy of Factory licensee, Copy of first bill generated showing the date of commencement of operations or other relevant document, Copy of Incorporation Certificate, Copy of land purchase deed duly signed by the applicant (If the Enterprise is functioning in its own land), Copy of new unit registration document/certificate, Copy of sanction order from Electricity Department for power supply with copy of the latest bill, Copy of Society Registration Certificate, copy of the latest electricity bill, Corporate Identification Number (CIN) Document, Details of proposed solar plant (capacity, cost estimate), Documents are required as per the department’s guidelines prescribed for this scheme, Documents Supporting Local Value Addition (for PLI claim), Documents Supporting Sales of Modules (for PLI claim), Domicile / residence certificate, Driving License, Education loan application, Electricity bill, Electricity Bill / Consumer Number, Electricity connection details (for Component-C), GST registration, Identity proof, Krishak Bandhu ID No (Visit here to Check your Krishak Bandhu ID), Land Documents, Land ownership / records, Land papers, Land Particulars, Land Records, Land records (7/12 extract), Memorandum and Articles of Association, Name of machinery/equipment/ implement, Name of manufacturer etc. to be selected from the Departmental Portal, Other Registrations Document, PAN card, Parivar Pehchaan Patra, Passport, Passport-size photograph, Performance Bank Guarantee, Power Consumption Report, Proof of electricity usage (bills or related documents), Proof of registration with GEDA, Proof of roof ownership / consent, Pump Specification, Ration card, Receipts or other proof of payment for items listed above, if applicable, Statutory Auditor Certificate / Chartered Accountant Certificate / Cost Accountant Certificate, Taxpayer Identification Number (TIN) Document, Van Adhikar Patra or Sanad (for farmers in forest areas). Gathering them once serves every application.
Apply to the schemes recorded against this opportunity
15 schemes on record.
Line up the licences and clearances the unit needs
DISCOM approval / net-metering — State DISCOM (Before grid connection). These are indicative — confirm each one with the authority named against it before you rely on it.
Grow into the businesses this one opens up
Green Hydrogen — Solar power can feed electrolysers producing green hydrogen · Renewable Energy — Wind and other renewables diversify beyond solar alone · Manufacturing — Assembling or servicing panels adds a business line beyond installation. Each is a full opportunity in its own right, with its own schemes.
Not mapped yet: After the loan · Once you're producing · Once you're selling.
These phases are an order, not a schedule. The corpus carries no approval times, processing windows or dates, so nothing here tells you how long a step takes — only what comes before what. Phases listed as unknown have no supporting data yet, so they are left empty rather than filled in with a guess.
We could score 4 things. 6 are still unknown.
Scored on 4 of 10 dimensions — ease, demand, risk, scalability, time to revenue and compliance data is not in the corpus. The 90% is of the 40 points those 4 dimensions carry, not out of 100.