344 schemes in our data support this.
Not known
Not known₹1,250 – ₹500 Cr
Official₹1 – ₹20 Cr
OfficialNo pathways mapped for this opportunity yet.
Every one of these is another opportunity page with its own money, approvals and pathways — keep walking the chain as far as it goes.
Nothing mapped yet.
Nothing mapped yet.
Nothing mapped yet.
Nothing mapped yet.
We show gaps rather than guesses. Every figure above either cites an official source or says where it came from.
Highlighted papers are required by at least one scheme.
Implementing departments are not linked to these schemes yet.
No bank products are linked to this opportunity yet — bank intelligence is not ingested.
Get the registrations every application asks for
Aadhaar — UIDAI (Before applying) · PAN — Income Tax Dept (Before applying) · Bank account — Any scheduled bank (Before applying) · Udyam registration — Ministry of MSME (To register the enterprise) · GST registration — GST Dept (Above the turnover threshold). The bracket is each authority's own wording on when it is needed — we hold no processing times for any of them.
Collect the documents these schemes ask for
1422 documents appear across this opportunity's schemes; 1422 of them are marked mandatory: Aadhaar card, Passport-size photograph, Self-declaration / affidavit, Bank account details, Detailed Project Report (DPR), Caste certificate, PAN card, Quotation from supplier, Loan sanction letter, GST registration, Udyam registration, Ration card, Birth / age proof, Income certificate, Disability certificate, Domicile / residence certificate, Identity proof, Land records (7/12 extract), Address proof, Copy Of Sale Deed For The Work Premises In Case The Premises Is Owned By The Applicant, NOTE, Proof of Age, Bio-Data Of All The Promoters (Duly Filled In All Respect As Per The Format Enclosed), CA Certificate for Fixed Capital Investment, Component, Consent Letter to Offer Collateral Security to the Extent Required by PIPDIC, Copy Of Partnership Deed And Acknowledgement Of Registrar Of Firms In The Case Of Partnership Concern, Copy of the Constitution of the Enterprise, Copy of the land deed (wherever applicable) (In case of rented /leasehold land/ buildings, copy of rent agreement and receipt /lease agreement), Memorandum And Articles Of Association (In The Case Of Private Limited Company), Proof of Residence, Statistics for Demand and Supply Position of Product with Proof, Existing Competitions, Major Consumers Details and Tie-Up Letters for Marketing the Product, A copy of loan sanctions letter and disbursement letter issued by financial institutions/ banks, A copy of the ownership document of the premises or a copy of the Lease deed/Rent Deed, Application Form, Audited Financial Statements, Balance Sheet And Profit And Loss Account For Last 3 Years And Bankers Details (For Interested Concerns Or Existing Units), Balance Sheet and Profit and Loss Account for Last 3 Years and Bankers Details for Interested Concerns/Existing Unit, Business proposal, Chartered Accountant Certified Bills, Claim Statement in the Prescribed Format (in Duplicate), Comparative Statement For Machinery With Justification For Choosing The Supplier, Comparative Statement For Machinery With Justification For Choosing The Supplier (For Loans Above ₹10,00,000/-), Consent Letter From Bank For Sanction Of Working Capital Loan, Copy Of Acknowledgement Of Micro, Small And Medium Enterprise Registration Certificate Obtained From Industries Department, Copy Of Acknowledgement Of Micro, Small And Medium Enterprises Registration Certificate Obtained From Industries Department, Copy of bills of Expenditure incurred, Copy of certificate for category (if applicable), Copy of first electricity bill (wherever applicable), Copy of first Sale bill, Copy of GPCB approved NOC/Consent & other departments approval (if applicable), Copy of Index-2 for Land, Copy Of Partnership Deed And Acknowledgement Of Registrar Of Firms (In The Case Of Partnership Firm), Copy of Self Certified Share Holding Pattern (If applicable), Copy of Self-Certified Shareholding Pattern (if applicable), Copy of the Bank Pass Book, Copy of the Driving Licence, Copy of Trade Licence, Detailed Project Proposal, Details Of Effluent And Arrangement Proposed For Treatment And Disposal Of Effluent (If Any During Process), Documents Required At The Time Of Filing Loan Application, Driving License, Educational Certificates, Educational Qualification Certificates, Encumbrance Certificate For 30 Years, Evaluation matrix by Nodal Institution, Expenditure Statement, Experience certificate if applicable, Financial Documents, Land, Land documents, Legal Opinion Report For Collateral Security Property, List of quality control equipment and testing facilities available in the factory, List of required documents, Manufacturing Process Details With Flow Chart, Matriculation Certificate, Mobile Number, NOTE 1, NOTE 2, Original Title Deed, Other Documents if any, Patta Copy, Power of attorney/Board resolution/Consent letter, Profitability Statement Detailing Monthly Sales / Income And Expenditure Details, Proof For Sale Price Of End Product From The Existing Manufacturer / Dealer, Proof of Address, Recommendation form by Nodal Institution (revised format is attached for reference), Registered Lease Deed or Rent Deed in such cases, Residence proof, Selected Machinery Supplier's Client List with Detailed Postal Address, Self-attested copy of resolution towards applying for this assistance in case of units other than proprietary, Self-Attested documents/ details to be submitted by the Authorized Person, Site And Factory Building Plan With Machinery Layout And Civil Estimate (2 Copies), Statutory Clearances, Supporting documents for SC/ST Enterprise, The Form and Documents as Mentioned in Annexure 1*, Track Record, Name and Address of Concerns and Type of Consultancy Service Rendered by the Consultant (If Any), Unemployment certificate (Unemployment Certificate is required only if applying as a new business), Voter Identity Card, 'No Due Certificate of Interest' issued by the financial institution/bank etc, "No Objection Certificate" for allowing him/her to undergo Internship Program, (Certified by Approved Civil Engineer/Architect.), (In case Building is on Lease/Rental basis/GIDC Shed.), (In case of Land is in the Name of Developer.), OR, (In case of Land is on Lease/Rental basis.), (In case of New and Unused Building is acquired by Developer.), OR, (Industries Association/any enterprise registered under Societies Act, Partnership Act, or the Companies Act or SPV), (Legal entity registered as Proprietorship, Limited Liability Partnership, Co-operative Society, Companies registered under Companies Act, Trust.), OR, (With Highlighted Survey/Block Nos.), /12 of Survey No. & 8A Khata Details for Land in which Industrial Park to be developed, /12 of Survey No. for Land in which Industrial Park to be developed, > EAMC - Global group revenue from automotive and/or auto component manufacturing and Global, ▪ For Loans Above ₹25,00,000/-, ▪ For Loans Upto ₹25,00,000/-, ▪ For Women, SC, ST, or Differently Abled Entrepreneurs, ◦ Bankers details for the existing unit, ◦ Brief Write Up on the Scope of the Project, ◦ Comparative Statement for Equipments with Justification for Choosing the Supplier, ◦ Copy of documents for the collateral security property, ◦ Copy of lease deed for the work premises on ₹10.00 stamp paper, ◦ Copy of Site and Building Plan Approved by PPA (2 Copies), ◦ Copy of the Community Certificate (in case of SC / ST applicants), ◦ Copy of the partnership deed (in the case of a partnership concern), ◦ Copy of the proceedings obtained from the Transport Department (if applicable), ◦ Copy of the RC book for the existing vehicle (if applicable), ◦ Copy of the Sale Deed for the Work Site, ◦ Copy of the Voter's Identity Card, ◦ Estimate for Building and Other Civil Works from the Approved Panel Valuers of PIPDIC, ◦ FMB (Field Measurement Book) Copy, ◦ Investigation Fee Payment Proof, ◦ List of Equipments Proposed to be Purchased for Hotel, Kalyanamandabam, Community Hall, Commercial Complex, or Commercial Godown, ◦ Original Title Deed and Antecedent Title Deeds, ◦ Proof of qualification (as the scheme is for qualified personnel in medicine, management, accountancy, engineering, architecture, etc.), ◦ Valuation Certificate, A certificate from a Chartered Accountant as per Annexure - I, A certificate in respect of fixed assets as per Annexure - II, A certified copy of the Age of Entrepreneurs issued by the Competent Authority is required to be produced with a subsidy claim, A Character Certificate from the authority of the Institute, A Chartered Accountant Certificate Certifying The Amount Paid To The Goan Regular Employees Towards Salary During That Year, A Copy Of Audited Balance Sheet Of The Unit For The Claim Year, A Copy Of Partnership Deed, Memorandum Of Association/ Articles Of Association (As The Case May Be), A Copy Of Partnership Deed, Memorandum Of Association/Articles Of Association, As The Case May Be, A Copy Of Payroll Of The Unit Highlighting The Number Of Total Employees, And Monthly Salaries Paid To Them In That Year, A copy of the audited balance sheet for the last 2 years wherever applicable, A copy of the Memorandum of Association and Articles of Association authenticated by the Registrar of Companies/ partnership deed (wherever applicable), A declaration of non-availment of incentives under other schemes (except SSIP, if applicable), A Letter from their Institute indicating his/her status in the Institution as a student, A list of plants and machinery with original value along with copies of the bills, money receipts, A Self-Attested Copy Of Registration Under Umbrella Scheme, A short write-up/presentation for final selection, A Statement Of Goan Employees Excluding Non-Eligible Goans And Monthly Salaries Paid To Them In That Year, A statement showing the names of workers, their age, date of appointment, nature of appointment and nature of work, Aaadhaar Number, Abstract And Executive Summary, Access to Workshop for Physical Count and Verification by GHRSSIDC Officials, Account must be in the name of the applicant as submitted in the application form, Account must be opened in Bank with Core-Banking facility to enable digital transfer of assistance, Acknowledgement receipt during filing the application online, Acknowledgement receipt for filing application for patent registration, Activity Reports for Each Training Module, Adangal Certificate (Original) (If the properties are agricultural lands), Additional Documents Required At The Time Of Filing Loan Application (Above ₹10,00,000/- & Up To ₹25,00,000/-), Adequate Qualification and Experience Documents, Admission Fee Receipt of the College, Admission letter, Admission Proof from the Institution Concerned in Case of Fresh Student, Admission Proof of the Next Academic Session from the Institution Concerned in the Case of Pursuing Student (As the Case May Be), Advance Stamped Receipt, Age Certificate, Age-proof document, Agreement, Agreement 1 - Agreement Deed between Beneficiary and Fisheries Department, Air/Water Consent Orders Obtained from DSTE, All Educational Certificates (10th Marksheet, 12th Marksheet, Graduation Certificate/Semester Marksheet (if applicable)), All eligible machinery must be registered and allotted a Unique Identification Number (UID), Alternate ID (if applicable), Amount statement file from bank, An inspection report from the concerned AD of the field office, Annexure -II- Recommendation of the Financial institution, Annexure of the balance sheet showing the gross fixed capital investment of the previous financial year, Annual Audited statement & IT returns for the last 3 years, Annual Progress Report, Annual Report of Applicant for 2018-19, Annual Report of Applicant for 2019-20, Annual Report of Applicant for 2020-21, Annual Report of Holding Company, Annual Report of last Year, Annual Report of Subsidiary(ies) for 2018-19, Annual Report of Subsidiary(ies) for 2019-20, Annual Report of Subsidiary(ies) for 2020-21, Annual Reports And Financial Statements (Last 3 Years), Annual Reports for the Last Three Financial Years, Annual Reports of Last 3 Years, Antecedent Title Deeds, Antecedent Title Deeds (Title deeds executed between vendors and third parties) for 30 Years (if possible) or 20 Years (Certified Copy or Original), Any Documentary Proof of Age, Applicable Licence Copies, Including Inspector Of Factories Approval, Municipal / Panchayat Permission, And Pollution Clearance, Etc, Applicable Licence Copies, Such As Inspector Of Factories Approval, Municipal / Panchayat Permission, And Pollution Clearance, Etc, Applicant Organization Deregistered/Black listed by Government /Govt. Bodies, if any, Applicant should not be defaulter in any Bank/Financial institution, Application Attachments, Application Fee Demand Draft Details, Application Fee Payment Proof, Application for grant of incentive under West Bengal Incentive Scheme, for Approved Industrial Park for MSMEs, Application Form (Annexure I), Application form duly signed and stamped. (Please print your online application and upload it here with your Signature and Stamp.), Application form in the prescribed format for self-employment, Application form submitted through i-TUFS portal, Application in the prescribed format, Application in the prescribed format ( as per Form-A), Application in the prescribed format (in duplicate), Application Stage, Approval Copy Obtained from the Director of Industries after Signing the Memorandum of Understanding (MOU) with the Technology-Providing Institution/Agency, Approval from the Quality Council of India for the Certifying Agency, Approval notification under the Scheme and approved extension if any, Approvals and Clearances (Where Applicable), Approved Lay-out Plan from Concerned Govt. Authority for the proposed Industrial Park, Approved Layout plan, Architectural Plan (If available), Article & Memorandum of Association, Artisan ID Card (for Individuals), Artisan Identity Proofs (for SC/ST/BPL Claims), Assets and liabilities statement of promoters and guarantors along with latest income tax returns, At Application Stage, At Benefit Disbursal and Post-Selection Stage, At Benefit Disbursal Stage, At the Time of Application, At the Time of Field Verification, At the Time of Filing Loan Application, At the Time of Subsidy Disbursal, At Verification Stage, Attendance / Salary Register for the Last Month of Claim Period, Attested Copies of the Bills and Copies of Receipts, Attested Copy of EB Meter Card, Attested Copy of Tangedco Meter Card, Audit Report (Before initiation of Expansion), Audit Reports (for Organizations), Audited Annual Accounts (Required Specifically for Fourth Quarter Claims), Audited Balance Sheet for the year before being defunct, Audited Balance Sheet of last financial year/Annual Report, Audited balance sheet of the unit of last year.), Audited Balance Sheet or Annual Report (latest), Audited financial report of last 3 years, Audited financial statements (12 months), Audited financial statements (base-year sales), Audited Financial Statements for the Last 3 Years, Audited Financial Statements for the Last Three Years, Audited report with balance sheet/Annual Audit Report (latest, if applicable), Audited Statement of Accounts, Audited Statement Of Accounts For Last Three Years, Audited Statement of Accounts of the preceding 3 years, Auditor’s Certificate, Auditor’s/ Chartered Accountant’s Certificate for utilization of funds, Authorisation Certificate, Authority Letter/Board Resolution for signing on behalf of Developer Company/Firm, Authority Letter/Board Resolution for signing on behalf of Developer Company/Firm (if applicable), Authority letter/Board resolution of the institution, Authorization letter, Authorization Letter from Head of Institution, Authorization Letter From OEM for Empanelment of Vendor*, Authorization of Karta (Hindu Undivided Family), Background, Balance Sheet and Profit & Loss Account for the Last 3 Years (For Existing Units/Interested Concerns), Balance Sheet And Profit And Loss Account For Last 3 years And Bankers Details (For Interested Concerns / Existing Unit), Balance Sheet And Profit And Loss Account For Last Three Years And Bankers Details (For Interested Concerns Or Existing Units), Balance Sheet And Profit And Loss Account For Last Three Years And Bankers Details For Interested Concerns / Existing Unit (For Loans Above ₹10,00,000/-), Balance Sheet And Profit And Loss Account For The Last 3 Years And Banker’s Details (For Interested Concerns/Existing Unit), Balance Sheet and Profit and Loss Account for the Last 3 Years and Bankers Details, Bank attested specimen signature of authorized persons, Bank Certificate for the Claim Period, Bank Guarantee, Bank linkage, Bank/Financial Institute certified Term Loan Account statement for Claim Period, Bank/Financial Institute certified Term Loan Account statement for take-over, Bankers’ Report giving details of the financial status of the applicant firm as per Performa (Draft at Annexure ‘E’), Baseline Survey Report, Basis (evidence) for land (if applicable), Benefit Disbursal And Reporting Stage, Bill Book with Triplicate Serially Numbered Bills, Bill/Invoice of the acquired technology, Bill/Invoices for Printing Charges of Literature and Display Material, Bills for expenses incurred, Bills/Receipts/Vouchers, Binding term sheet with technology partner, or, Bio-Data of All Promoters/Entrepreneurs (Duly Filled in All Respects), Bio-Data Of All The Promoters (Duly Filled In All Respect As Per The Format Enclosed) (For Loans Above ₹10,00,000/-), Bio-Data of All the Promoters (Duly Filled In All Respects as Per the Format Enclosed), Bio-Data of the Applicant (Duly filled in all respects), Birth Registration Certificate, Board Resolution / Authority Letter / PoA, Board Resolution committing investment and funding source (only for Segment D applicants if net worth is below 50% of proposed investment), Board Resolution for Authorised Signatory, Board resolution for signing authority (in case of partnerships, LLPs, Pvt. Ltd., or Limited Companies), Board Resolution regarding Authorized Signatory, Board resolution/ Power of attorney, Board Resolution/Power of attorney in the name of Authorized Signatory, Bonafide Certificate/Proof of Admission from the School/College/Institution, BPL Card, BPL Card/document proof, BPL certificate (if applicable), BPL/AAY Card (if applicable, for Below Poverty Line/Antyodaya Anna Yojana card holders), Brief Description of ERP Module installed by Applicant, Brief description of technology with notes on benefits, outcome/result after adoption of technology on letterhead, Brief history of the organization and current nature of activity and road map for implementation of this project, Brochure/Catalogue of Exhibition/Trade Fair, Business license copy, Business Plan, Business Plan / Pitch, Business plan and proposed activities in the shed, Business Profile/ Corporate Presentation of the Applicant (incl. subsidiary(ies)), Business proof, Business proposal document with innovative idea details, Business Registration Certificate (If Applicable), Bye-Laws, CA Certificate as per Annexure 5.2, CA Certificate confirming MSME status on listing date, CA certificate for capital investment, CA certificate for details of expenditure incurred on acquisition of technology (Annexure 3.3), CA Certificate for Expenditure incurred (containing details as per prescribed Format), CA Certificate for Investment in Plant & Machinery (original value) and turn over, CA certificate for MSME Status, CA certificate of details of Expenditure incurred (in original) Annexure 6.2, CA certificate of Expenditure (in original) giving the details (Annexure-III page -7), CA Certificate of expenditure statement for equity raise through SME Exchange with total and subtotal Headwise, CA Certificate of expenditure statement with head-wise details, CA certificate regarding fixed capital investment, CA Certificate regarding MSME status as per MSMED act-2006 as on listing date, CA certificate showing the gross fixed capital investment before initiating expansion/diversification/forward or backward integration, CA Certified Balance sheet /Annual Audit Report. (if applicable), CA Certified Balance-sheet /Annual Report. ( if applicable), CA certified Detailed expenditure statement for installing the ERP System, CA certified Detailed expenditure statement for obtaining the ICT System, CA certified Detailed expenditure statement for obtaining the Quality Certification, CA Certified Net Worth of the Developer Company/Firm/Promoters, CA-Certified Detailed Expenditure Statement for Obtaining ZED Certification, Cancelled Cheque (for RTGS/NEFT), Cancelled Cheque of the Enterprise, Capital Expenditure Documents, Case-Specific Documents, Caste / Community Certificate, Caste / Special Category Certificate (if applicable), Caste/Community Certificate, Category Certificate (for reserved allotment), Category Certificate (if belonging to SC/ST/OBC), Certificate [consent to operate (air/water)] from Pondicherry Pollution Control Committee, Certificate for mutation and conversion of land, Certificate for the Installation of Pollution Control Equipment Obtained from the Directorate of Sustainable Technologies and Environmental (DSTE), Certificate for vendor, Wedding ID card, Recommendation letter issued by Municipal body, Certificate from Chartered Accountant, Certificate From Chartered Accountant Stating That No Claim From The Department Of Information Technology, Government Of Goa Has Been Made For Any Incentives, Certificate from the bank for the interest claim for each quarter as per Annexure A, Certificate from the Company Secretary of the Applicant / Managing Director for Credit History (incl. subsidiary(ies)), Certificate from the Director, ESI as per Annexure-III, Certificate from the Primary Weaver Cooperative Society confirming that the applicant is an active member and not a defaulter, Certificate from the Regional Provident Fund Commission as per Annexure - III, Certificate Issued by Nationalized Banks or Specified Financial Institutions in Respect of Total Interest Paid by the Units, Certificate issued by the Financial Institution/Bank, Certificate Issued by the Village Administrative Officer to Prove the Owner's Possession (Original), Certificate Issued by Village Head (as per prescribed format), Certificate of Chartered Engineer certifying performance improvement as per (Annexure 3.4), Certificate Of Competent Authority For The Purpose Of Doing Pottery Work, Certificate of completion of construction of Basic and Common Infrastructure Facilities and CETP, if any, Certificate of completion of the training program, clearly indicating the name of the participants (founder/co-founders of startup), Certificate of Educational Qualification, Certificate of Incorporation, Certificate of Incorporation (Issued by ROC), Certificate of Incorporation/ Partnership deed, Certificate of Incorporation/Partnership Deed/Firm Registration or equivalent document related to incorporation of the enterprise, Certificate Of Meaning (Required For Other Artisans Associated With Pottery Business), Certificate of No Financial Assistance from Other Sources, Certificate of OBC/SC/ST/Physical handicraft, if any, Certificate of physically handicapped, if applicable, Certificate of Registration of the organization, Certificate of training, if any, Certificate of Vending, Certificate of Vending / Letter of Recommendation (LoR), Certificate regarding total annual family income from the concerned Tahasildar, Certificate regarding training/experience of the activity under which the loan is sought, Certificates or documentation showcasing previous skills or entrepreneurial experience (if applicable), Certification confirming utilization of loan for purchase of plant and machinery/equipment or apparatus, Certified Bank Transaction Details of Proceeds of Exported Jute Diversified Products, Certified Bank Transaction Details of Raw Material Purchased, Certified bills by a Chartered Accountant, Certified Chartered Accountant Reports (Supporting Production and Export Turnover), Certified copy of the ownership certificate of land and building, Change of Land Use (CLU)/ NOC from competent authority, if applicable, Chartered Accountant (CA) Certified Copies of Annual Reports for the past 3 years (in Microsoft Excel format), Chartered Accountant Certificate (with Membership Number) showing Shareholding Pattern (indicating number of shares and investment), Chartered Accountant Certificate for Payment Made to Quality Certifying Agency/ Patent Attorney/ Technical Providing Institution & Agency, Chartered Accountant Certificate for Payment Made to the Energy/Water Audit Institution/Agency, Chartered Accountant Certificate for Payment Made to the Exhibition Organiser, Literature, and Display Material, Chartered Accountant Certificate for the Investment in Fixed Assets / Pollution Control Equipment / Generator, Chartered Accountant Certificate for the Payment Made to the Energy/Water Audit Institution/Agency, Chartered Accountant Certificate for the Payment Made to the Exhibition Organizer, Literature, and Display Material, Chartered Accountant Certificate for the Payment Made to the Quality Certifying Agency / Patent Attorney / Technical Providing Institution & Agency, Chartered Accountant Certificate To Support Cumulative Capital Investment, Previous Benefits Availed, And Details Of Substantial Expansion, Chartered Engineer Certificate, Check-List of Fresh Registration/ Annexure, Check-List of Provisional Registration, Checklist for Documentation, Checklist for Loan Application, Chitta Nagal of the Said Property (Original), CIBIL Report of the Company (incl. subsidiary(ies)), Claim Statements in the prescribed format (in duplicate), Claim Submission Documents, Claim Submission Stage, Cluster Diagnostic Study Report, Cluster Formation Certificate, Collateral and Fees, Collateral Documents, Collateral Security Documents (Collateral security in the form of immovable property must be offered), Collateral security equal to the quantum of contribution sought or equal to the amount the unit is eligible for (in case of approval), College ID Card, Commitments For Space, Operation And Sustenance Of The Facility, Common to all assistances viz. Startup, Investment and Technology Support, Community Certificate (If Applicable for SC/ST), Community Certificate (In case of SC / ST applicants), Community Certificate for SC/ST/OBC applicants (If applicable), Community Certificate Obtained From Revenue Department, Company / Applicant Details, Company credentials and Financial Statements (Balance Sheet and Profit and Loss) of Private Sector Companies forming SPV in the last 3 years, Company Incorporation Certificate, AoA and MoA(in case of Pvt. Ltd./ Public limited company), Company Incorporation Documents, Company Registration & Eligibility, Competition analysis – key competitors, advantage of product/ service over, Competition analysis – key competitors, the advantage of product/ service over competition, etc, competition etc, Completed application form (obtained from the Madilu Programme website or Rural Development Office), Completion Report, Compliance Certificate, Component-wise details of the project and necessity, Concept or Approach Note, Consent Letter from the Bank for Sanction of Working Capital Loan (For Loans Above ₹10,00,000/-), Consent Letter from the Concerned Bank Branch, Consent Letter To Offer Collateral Security To The Extent Required By Pondicherry Industrial Promotion Development And Investment Corporation (PIPDIC), Consent Letter To Offer Collateral Security To The Extent Required By Pondicherry Industrial Promotion Development And Investment Corporation Limited, Consent Letter To Offer Collateral Security To The Extent Required By Pondicherry Industrial Promotion Development And Investment Corporation Limited (PIPDIC), Consent Letter To Produce Registered Lease Deed For The Work Premises (For Loans Above ₹25,00,000/-), Consent to Establish Certificate from WBPCB, Consent to Establish from GPCB, if applicable, Consent/Interest letter, Constitution / Incorporation Documents, Constitution of Enterprise (Memorandum & Articles of Association), Constitution of Enterprise (Memorandum of association, partnership deed, etc), Constitution of the enterprise (MOA & AOA), Constitution of the Institution with registration certificate, Constitutional Documents, Construction plan and cost estimate duly authenticated by Architect/ Chartered Engineer, Consumption And Inventory Register, Contract of Employment of Employees*, Copies of all Electricity Bills and corresponding money receipts for which the claim is made, Copies of all relevant electricity bills (to be submitted as and when received), Copies of documents regarding contributions made to ESI/EPF, Copies Of Employees’ State Insurance (ESI)/Provident Fund (PF) Returns (Wherever Applicable), Copies of Export Compliance Certificates (Such as CEN, SA8000, SEDEX, GOTS, OEKOTEX, FAIRTRADE, ISO), Copies of ISI/BIS/ISO9000/ISO14000/ISO 14001/ISO 18000 Certificate, Copies of Monthly or Quarterly Export Returns Submitted to Government Authorities, Copies of Purchase Bills or Vouchers for Jute Raw Material, Copies of recent supply orders, Copies of relevant bills, money receipts for expenditure incurred for obtaining ISI/ BIS/ ISO9000/ ISO14000/ ISO 14001/ISO 18000, Copies of relevant bills, money receipts for expenditure incurred towards cost of Captive Effluent Water Treatment Plant and Pollution Control Devices, Copies of relevant bills, money receipts for expenditure incurred towards cost of Energy Audit and installations for energy conservation, Copies of relevant bills, money receipts for expenditure incurred towards cost of Pollution Control Devices, Copies of relevant bills, money receipts for expenditure incurred towards the cost of Energy Audit and installations for energy conservation, Copies of Sale deed/lease deed registered with concerned sub-registrar showing the details of stamp duty, Copies of Voter's Identity, Copies of Voters Identity Card, Copies regarding SGST, Copy of a Cancelled Cheque Leaf, Copy of Account Statement/Passbook, Copy of Accreditation of Energy Auditor by Bureau of Energy Efficiency [BEE], Copy of Acknowledgement of MSME Registration Certificate Obtained from Industries Department, Copy of agreement, Copy of application submitted to patent office along with Form 2, Copy of Audited Balance sheet/ ITR of the last financial year, Copy of balance sheet of last 2 years, Copy of Balance sheet/ITR of the last financial year, Copy of Bank Pass Book, Copy of Bills for Expenditure incurred, Copy of bills issued by Power Distribution company, Copy of Board Resolution/Consent Letter/Power of Attorney, Copy of Board Resolution/Consent Letter/Power of Attorney. (if applicable), Copy of business registration certificate, Copy of CA Certified Balance Sheet of the last financial year./Annual Audit report. (if applicable), Copy of CA Certified Balance Sheet of the last financial Year/Annual report, Copy of CA-Certified Balance Sheet of the Last Financial Year/Annual Audit Report, Copy of cancelled cheque, Copy of Cancelled Cheque (To be submitted in first claim only), Copy of cancelled cheque with the name of the proprietor printed, Copy of certificate for differently abled persons from a competent authority, Copy of Chitta & Adangal in respect of Tamil Nadu, Copy of Chitta & Adangal or Land Possession Certificate with Adangal in Tamil Nadu, Copy of Constitution of Developer Company/Firm, Copy of CTE issued by the GPCB (if applicable), Copy of documents on fees paid for Patent registration, Copy of documents regarding supply of electricity to the unit, Copy of Electricity Bill, Copy of Eligible Certificate (EC), Copy of EM Part-II/UAM, Copy of Energy Audit Report/Recommendations of the Certified Agency related to the claim in question, Copy of ERP System installation certificate from supplier, Copy of Factory licensee, Copy of first bill of sale/supply, Copy of First Sale Invoice Raised After the Commencement of Commercial Production, Copy of GPCB approvals (if applicable), Copy of GPCB Approved NOC/Consent & Other Department Approvals (if applicable), Copy Of ID/Registration Of Membership Of Bakers Association, Copy of Importer Exporter Code Certificate, Copy of Industry registration, Copy of L.C, Copy of land Deed/ legal possession of the land for Park, Copy of Land Possession Certificate issued by the competent Revenue authority of Kerala, Copy of land purchase deed duly signed by the applicant (If the Enterprise is functioning in its own land), Copy of last electricity bill, Copy of latest electricity bill, Copy of lease deed (agreement) with the owner's proof of ownership of land/property, Copy Of Lease Deed For The Work Premises In ₹10.00 Rupees Stamp Paper, Copy Of Lease Deed For The Work Premises In ₹10.00 Rupees Stamp Paper (If Premises Is Leased), Copy Of Lease Deed For The Work Premises In ₹10.00 Stamp Paper, Copy Of Lease Deed For The Work Premises In ₹10/- Stamp Paper (For Loans Up To ₹25,00,000/-), Copy of Lease Deed for the Work Premises on ₹10.00 Stamp Paper (Or Registered Lease Deed for a Period Not Less than 8 Years for Loans Above ₹25,00,000/-), Copy of Lease Deed for the Work Premises on ₹10/- Stamp Paper (or Registered Lease Deed for Loans Above ₹25,00,000/-), Copy of Machinery Invoice, Copy of Membership Card/any other proof of membership, Copy of MoU/other relevant document with the Institution for acquisition of technology, Copy of mutation & conversion certificate of land/ building, Copy of Notarized Lease Deed/Rent Deed/Agreement with owners of Building, Copy of Notarized Lease Deed/Rent Deed/Agreement with owners of Land, Copy of Original Bills From Service Providers/OEMs/authorized Vendors*, Copy of other statutory licenses/certificates, if necessary, Copy Of Partnership Deed And Acknowledgement Of Registrar Of Firm (In The Case Of Partnership Concern), Copy Of Partnership Deed And Acknowledgement Of Registrar Of Firms (In Case Of Partnership Firm), Copy of patent publication / notification, Copy of Patent Registration Certificate, Copy of Permanent Registration Certificate or necessary proof of registration with the Directorate of Industries, Trade and Commerce, Copy of plan Approvals from the local body / Industrial Estate Authorities along with site plan, Copy of Power Distribution License company Certificate (HT/LT), Copy of Proceedings, Copy Of Proof For Having Registered As An Approved Supplier With Other Financial Institutions / Banks, Copy Of Proof For Having Registered As An Approved Supplier With Other Financial Institutions / Banks (Along With Selected Machinery Supplier’s Client List), Copy Of Proof For Having Registered As An Approved Supplier With Other Financial Institutions / Banks (For Loans Above ₹10,00,000/-), Copy Of Proof For Having Registered As An Approved Supplier With Other Financial Institutions Or Banks, Copy of Proof for Ownership of Building, Copy of Proof of Listing in Exchange, Copy of proof of Recognized/ Approved Certification body, Copy of Property Document/ Copy of Index/Copy of sale deed and Copy of the approved plan for the project from Competent Authority/other approvals, Copy of Public Issue Boucher/prospectus, Copy of Quality Certification, Copy Of Receipt Of Beneficiary Contribution, Copy of Registered Land Sale deed documents with receipt from Registrar regarding the payment of Stamp Duty/Registration Charges, Copy Of Registered Lease Deed For The Work Premises For The Period Not Less Than Eight Years (For Loans Above ₹25,00,000/-), Copy of Registered Sale deed/Lease Deed/Rent Deed/Agreement with applicable Certificate of Stamp-duty and Registration receipt, Copy Of Registration, Copy of Registration for Constitution of Developer Company/Firm, Copy of rent / Leased agreement, Copy of Rent Receipt, Copy of Safety audit certification, Copy of Sale Deed & Index-2 of Land purchased for Industrial Park, Copy of Sale Deed for the Work Premises if Owned by the Applicant, Copy of sanction order from Electricity Department for power supply with copy of the latest bill, Copy of Sanction/Approval Letter/EC issued for Interest Subvention under RIPS 2024, Copy of sanctioned and connected Load Certificate issued by Power Distribution License Company, Copy of Self Certified Share Holding Pattern(If applicable), Copy of Self certified Shareholding pattern, Copy of Self-certified Shareholding pattern, Copy of signed & stamped MOU/Agreement/Contract regarding technology acquisition, Copy of Sme Exchange Registration, Copy of SME Exchange Registration Listing related letter by BSE/NSE/SME Exchange, Copy of Technology Agreements with Technology Provider (if applicable), Copy of term loan account statement / bank certification of first disbursement certificate, Copy of Term Loan Account Statement/Bank Certificate for 1st Disbursement of Term Loan, Copy of Testing Equipment Purchased Booklet (if applicable), Copy of Testing Equipment Purchased booklet/ reference letter for quality testing instrument/equipment and machinery from authorized body, Copy of the Acknowledgement of the MSME Registration Certificate Obtained from the Industries Department, Copy of the Bill of Expenditure Incurred, Copy of the bill of expenditure occurred, Copy of the bills raised by certifying agency and proof of payment thereof, Copy of the cancelled cheque, Copy of the Community Certificate (In Case of Scheduled Caste / Scheduled Tribe), Copy of the constitution of the enterprise (registered partnership deed for partnerships), Copy Of The Demand Survey Report (If A Demand Survey Was Conducted For The Need Of The Science City At The Proposed Location), Copy of the Detailed Energy Audit Report, Copy of the Land Possession Certificate issued by the competent Revenue Authority of Kerala, Copy of the Last Electricity Bill, Copy of the Memorandum of Association and Articles of Association authenticated by the Registrar of Companies / partnership deed (wherever applicable), Copy of the Partnership Deed (In the Case of Partnership Concern), Copy of the Proceedings Obtained from the Transport Department, Copy of the property tax receipt (for service activities), Copy of the Registration Certificate (RC) Book (For Existing Vehicle), Copy of Trademark Certificate*, Copy of valid consent to operate certificate from the WBPCB, Copy of Valid Registration Cum Membership Certificate, Copy of Valid Registration Number, Copy of VISA of persons who attended the exhibition and air ticket and boarding pass (if international travel), Copy of ZED Certification, Corporate Identification Number (CIN) Document, Cover Sheet, Death Certificate, Death Certificate / Certificate of Disability (case specific), Declaration Executed Before a Magistrate Regarding Employee Eligibility, Declaration for rent Agreement is not between Blood relation/ family member, Declaration of non-eligibility under other state startup schemes (if applicable), Declaration of Promoter with Sign, Declaration signed by the applicant MSE Unit accepting conditions of registration as per Annexure D, Declaration that machinery is new and unused, Declaration that no benefit is being claimed under any other Central Government scheme for the same machinery, Declarations and Undertakings, Demand Draft In The Name Of 'GMK & RTI' From An Authorized Bank (For 25 Percent Beneficiary Contribution), Demand Draft of ₹50/- payable in favour of the General Manager, District Industries Centre, Description of product/ service, Design Brief For Building And Infrastructure, Detailed Annual Action Plan, Detailed expenditure statement certified by a Chartered Accountant, Detailed project cost breakup, Detailed Project Proposal describing the research, innovation, objectives, methodology, and expected outcomes, Detailed project proposal, including innovative idea/concept, Detailed Project Update Report, Details Asked For In The Application At Page Numbers 12, 13, 14, And 15 (Must Be Furnished Compulsorily To Prepare Appraisal Report), Details Asked For In The Application At Page Numbers 12, 13, 14, And 15 (To Prepare Appraisal Report The Details Are To Be Furnished Compulsorily), Details Asked For In The Application At Page Numbers 12, 13, 14, And 15 Are To Be Furnished Compulsorily (To Prepare Appraisal Report), Details confirming engagement in coir product activities, Details in support of benefits applied for, Details of any other Notable Achievements, Details of any Previous Awards Received (if applicable), Details of any previous incentive awards received (if applicable), Details of Apprentice (If applicable), Details of Areas of Activity, Details of availability of machinery for training, Details of Captive Effluent Water Treatment Plant and Pollution Control Devices, Details of Court Cases, if any, Details Of Effluent And Arrangement Proposed For Treatment And Disposal Of Effluent (If Any During Process) (Required For Loan Amounts Above ₹25,00,000/-), Details of establishment of existing infrastructure facilities in case of upgradation of infrastructure, Details of existing business (in case of expansion), Details of fees to be paid for participating in the acceleration program – preferably on the letter head of the host organization, Details of fees to be paid for participating in the acceleration program – preferably on the letterhead of the host organization, Details of Govt. Dues and Outstanding, if any, Details of Handloom Weaver/Worker, Details of Handloom Weavers/Workers’ Child, Details of Industries to be benefitted from this project in the format mentioned below, Details of installations for energy conservation, Details of Legal Constitution of the Organization (Please enclose an attested copy of the registration certificate), Details of MSMEs with EM no. to which plot of land/ shed / buildings/ installations have been allotted, Details of Plant & Machinery, Details of Pollution Control Device, Details of power connection, Details of Product-Mix Being Produced and Exported, Details of proposed work, Details of Recognitions & Awards, Details Of Registration (Copy To Be Provided As Annexure, If Applicable), Details of Team/Staff with cluster experience, Details of the mode of acquiring the basic Infrastructure, Details of the source of raw material for training, Details of Used / Second Hand / Refurbished Plant, Machinery, Equipment and Associated Utilities (if applicable), Details Required In The Application At Page Numbers 12, 13, 14, And 15 (To Be Furnished Compulsorily To Prepare The Appraisal Report), Development work maps and cost estimates, Discharge Certificate (in case of injury), Document For Number Of Employees, Document for Proof of Age, Documentary evidence for verification by BIG Partners, Documentary proof for registration on eCommerce Platform for reimbursement of eCommerce fee, Documentary Proof Of Industry Tie-Ups (For Skill University), Documentation For Payment Of Investigation Fee @ 0.50% On The Loan Amount Applied Plus Applicable Service Tax, Documentation Related To Loan Availment (From Nationalized Banks, Scheduled Commercial Banks, Co-operative Banks, Or Registered Credit Societies), Documentation showing Ownership of Land (Leased / Owned) for the Project, Documentation showing Possession of the building (Leased / Owned) for the Project, Documents are required as per the guidelines of the Uttarakhand Khadi and Village Industries Board for availing the benefits under the scheme, Documents are required as per the Policy guidelines to avail the benefits of the scheme, Documents for Engagement of Energy Auditor/Letter of Acceptance from Energy Auditor, Documents From The Gram Panchayat/Municipality Or The Concerned Authority At The Place Where The Furnace Is To Be Built, Documents Regarding Participation In Exhibitions For Marketing Of Products In Foreign Countries, Documents related to current residence in Rajasthan, Documents related to permanent residence in Rajasthan, Documents required as per selected Trade, Documents Required At The Time Of Application Filing, Documents Required At The Time Of Filing Loan Application (For Loans Up To ₹10,00,000/-), Documents Required At The Time Of Filing Loan Application (Up To ₹10,00,000/-), Documents Required At The Time Of Filing Loan Application (Up To ₹25,00,000/- Loan Limit), Documents Required During Processing Time or After Sanction of Loan, Documents Required Either During Processing Time Or After Sanction Of Loan, Documents Required for Fresh Registration, Documents Required for Provisional Registration, Documents Required for Renewal, Documents showing payment of fees for Land Conversion & Mutation, Documents showing payment of Stamp Duty and Registration Fee, Documents showing the recruitment from the Employment Bank of the State, Documents Submitted At The Time Of Filing Loan Application, Documents Submitted Either During Processing Time Or After Sanction Of Loan (For Collateral Security), Documents To Be Submitted At The Time Of Filing Loan Application, Documents To Be Submitted During Processing Time Or After Sanction Of Loan, Documents To Be Submitted Either During Processing Time Or After Sanction Of Loan (For Loans Up To ₹25,00,000/-), Documents to establish whether the applicant belongs to SC/ST Category, wherever applicable, Documents/details for candidate/trainee, Documents/details for Training sponsoring agency, Domestic Value Addition (DVA) estimate, DPIIT registration/valid MSME certificate, DPIIT Startup Recognition Certificate, Driving Licences, Driving License (issued by Regional Transport Office (RTO), Duly attested Annexure for Land Details in Prescribed Format, During Application, During Benefit Disbursal, During Online Application, During Processing or After Sanction of Loan, During Processing Time or After Sanction of Loan, E-Shram card (for cobblers/shoemakers), e-Shram Card Number, EDP certificate, Education loan application, Educational Certificate, Educational certificates or qualifications (if applicable), Educational or Technical Qualification Certificates, Educational qualification, Educational Qualification Certificate, Educational Qualification Certificates (for verification; original documents will not be retained by Training Providers/Training Centres), Educational Qualification Documents (for vocational education/training), Educational Qualification in line with the training programme being applied for, Educational Qualification proof- Transfer certificate/ Record Sheet issued by School/College.(Two Copies), Educational Qualification- School or College, Election Card, Electricity Service Connection / Bills, Email id, Employee Government ID, Employment and Income Documents, Employment Bank registration( if applicable), Employment Generation Details, Employment plan, Employment records, Employment Statement for the Last Month of the claim Period in Prescribed Format, Encumbrance Certificate for the Property for 30 Years Prior to the Date of Sanction Order (Original), Encumbrance Certificate for the Said Property for 30 years prior to the date of sanction order (Original), Endorsement Form, Endorsement from Promoting Organisation (if applicable), Endorsement from the Head of Institute (File should be in pdf format only), Endorsement/consent letter from the host, Energy/Water Audit Report, Engineer’s certification from the approved panel, Enlistment Fee, Entity Registration Certificate, Entrepreneurs Memorandum Part-2 (UAM/ PMT) Registration/ Commencement of Production Certificate, Establishment date & summary of registered organization, Estimates of Power Distribution company (DISCOM) and Receipt, Event Brochure/Invitation Letter, Evidence of access to key samples needed to execute the project (eg, Evidence of access to the unique facility(ies) needed to execute a project, EWS Certificate for non-minority candidates, Executive summary, Executive Summary of the project, Expected incentive calculation, Expenditure Statement on company letterhead, Expenditure Statement on Letter Head, Expression of Interest / application on PLIS portal, Expression of Interest. (If Specifically Requested During the Initial Call), External auditor certification, Facility Details (Workshop/Production Area Documentation), Family Declaration (To Confirm Only One Person Per Family Is Availing Benefit), Feasibility report of the project to be certified by a scheduled commercial bank, Feasibility Study Report, Feedback Form, Feedback report (as per format attached) within 1 month after attending the acceleration program, Field Measurement Book Copy (FMB Copy), Field Measurement Book Copy (FMB Copy) of the Said Property (Original), Filled Application Form (individual artisan), Final Accounts Of The Claim Year, Final Eligibility Certificate issued under the Scheme (If Obtained), Financial analysis, Financial and Entity Documents, Financial and Project Documents, Financial Closure Documents, Financial Details of Subsidiary(ies), Financial details of the term loan availed, Financial documents, including projected revenue and funding requirements, Financial feasibility report/certification (if any), Financial information of the last 3 years(Attach the copies of the Audited Financial Report), Financial Statements And Audit Reports, First Sale Bill, First Sale Bill ( In case of Commercial Production is commenced), Following certifications to establish the income criteria can be used by the applicant -, For 1st Loan, For Annual Incentive Claim, For Application Form Submission, For Approval, For cases with exposure above ₹ 25 Lakhs, For Category A and B vendors, For Category C and D vendors, For Claim, For Claiming 1st Installment, For Claiming 2nd Installment, For Claiming Subsidy, For Claiming the 1st Installment, For Claiming the 2nd Installment, For Eligibility Certificate Application, For Equity, For Fresh Proposals, For Fresh Proposals as well as Reimbursement Proposals, the applicant is required to certify the following, For Internal Accruals, For Investment Support {in addition to 1-10 above (a) }, For Kishore, Tarun and Tarun Plus Loan, For Letter of Recommendation, For Obtaining Feasibility Report, For Registration, For Reimbursement Proposals, For release of subsequent installments, the DAs shall be required to submit the following documents, For Rural Areas, For Sanction, For Second Loan, For Shishu Loan, For Start-up Support {in addition to 1-10 above (a)} (to be furnished after the Term Loan is sanctioned by the Financial Institution), For Subsidy Application (II C), For Technology Support {in addition to 1 – 8 under (a) plus 1 to 4 under (c)}, For Term Loan, For Unsecured Loan, For Urban Areas, For Verification (Upon Request), For Verification Stage, Formal agreements/ MoUs with other key facility(ies) providers/ suppliers, FSSAI registration, General Documents, Govt. Issued ID Card of applicant, GPCB consent (if applicable), Grant Agreement Document, Green Social Security Card for Employees (Effective From 1st January 2009), Guarantee Fee Payment Details, Half-yearly Salary Details of Employees, Handicraft/Weaving-related documents (proof of work, registration, etc.), Handloom Organization– Registration Certificate, Balance Sheet, Profit & Loss Account, name of the weavers registered with the Organization, etc, Handloom Weaving Training Certificate (Attested Copy), High School Certificate, House Tax Receipt or Form I/XIV (as proof of property for guarantor), How does it work?, Identification Number for Alternate ID (if applicable), Identification Proof, Identity and Address Proofs, Identity and Entity Documents, Identity and Personal Documents, Identity Card, Identity card issued by the O/o DC(Handlooms), Identity card issued by the State Government, IEM (Industrial Entrepreneur Memorandum), if applicable, If an Alternate Source of Energy [other than Electricity] is Used, Proof for the Usage, If the Energy Auditor is Employed in a Firm/Co., or Partner or Director of a Firm/Co., Then Proof for the Same, if the Enterprise is Functioning in Its Own Land, If the land/building is on rent then the rent name, Implementation Schedule of the project, Import Export Code (IEC) Registration Certificate, Importer-Exporter Code (IEC), In absence of third party guarantee, Asset & Liability statement from the borrower including Directors & Partners may be sought to know the net-worth, In case of belated application, request for condonation for delay in filing application, In Case the Applicant Is a General Power of Attorney (GPA) Holder, Attested Copy of the Registered GPA, In case the applicant is a GPA holder, an attested copy of the registered GPA, In the case of accidental claim, police inquiry report will also be required to be submitted, In the Case of International Exhibition attach Copy of Passport Stamping of Immigration by that Country, In-house capability document, or, Income Details, Income Proof Of The Applicant And Spouse (To Verify Income Does Not Exceed ₹3,00,000/- Per Annum), Income Tax (IT) Returns, Income Tax Return for the Last Financial Year, Incorporation / Registration Documents, Incorporation Certificate/Registration Certificate, Individuals, Industrial Contribution Commitment Letter (File should be in pdf format only), Industries recommendation/demand/support letters, Informative document of the acceleration program (brochure, leaflet, a letter from the host organization, etc.), Informative document of the acceleration program (brochure, leaflet, letter from host organization etc.), Informative document of the training program (brochure, leaflet, a letter from the host organization, etc.), Innovation (Brief description of the idea highlighting innovative element), Inspector of Factories Approval, Installation certificate or commissioning report, Institute Contribution Commitment Letter (File should be in pdf format only), Institute/Any Other Legal Entity (Applicant) Details, Institution/Organization Affiliation Certificate (or Startup Registration Certificate, if applicable), Interest Certificate from a Scheduled Commercial Bank or a Public Financial Institution, Intermediate or equivalent passing certificate, Investigation Fee At 0.50% On The Loan Amount Applied Plus Applicable Service Tax (50% Concession Must Be Paid By Women Entrepreneurs), Investigation Fee At 0.50% On The Loan Amount Applied Plus Applicable Service Tax (For Women Entrepreneurs, 50% Concession Has To Be Paid), Investment / capacity-expansion proposal, Investment projections document, Investment proof (invoices, purchase orders of plant & machinery), Invoice / Bill (original) with Taxpayer Identification Number (TIN) towards the purchase of irrigation equipment, Invoice / Bill (original) with TIN No. in case of Sprinkler/Drip Equipment, Invoice for Stall Rent from Organizing Body and Travel Fee (Including Tickets), Invoice/bill/Proof of payment of Plant, machinery and electrification, Invoices and Payment receipts of fees paid to patent attorney, Invoices for purchased software/Equipment for digitization along with payment proofs, Invoices of eligible plant and machinery, Invoices/Bills in case of various compounds under digital marketing, Janadhar Card, JIT verification report (to be filled by the inspection team), Joint Inspection Documents, Joint Inspection Report, Justification for technology acquisition/upgradation, Khadi artisan card or Khadi Institution registration certificate, Khadi/Polyvastra Certification, KYC Documents, KYC documents required in addition to CoV/ID/LoR, Land / Collateral Documents, Land / Location Documents, Land / Shed Documents, Land deed, Land Ownership / Lease Documents (For New Cluster Development), Land Ownership Documents, Land Ownership Documents (Where Applicable), Land records/possession certificate duly certified by the Village Authority/ State Government Authority/ Competent Authority, Land records/possession certificate duly certified by the Village Authority/State Government Authority/Competent Authority, Land/Shed details, Last Three Years Annual Turnover Certificate (Not Applicable For Skill University), Last Three Years Audited Balance Sheet, Last three years balance sheets of the Associate / Group Companies (if any), Last two years balance sheets of the units along with income tax/sales tax return etc. (Applicable for all cases from Rs.2 Lacs and above), Latest Audited Balance Sheet, ITR, P&L statements of the Company, if applicable, Latest Electricity Bill, Latest Electricity Bill Copy, Latest Tax Paid Receipt (Original), Lay-out of the Project, Lay-out of the Project (Certified by Approved Civil Engineer/Architect), Lay-out of the proposed Industrial Park (Certified by Approved Civil Engineer/Architect), Letter of acceptance or MoU with incubator, Letter of Authorisation (on company letterhead, signed by Director), Letter of Authorization by Board of Directors or Managing Director or Equivalent (incl. subsidiary(ies)), Letter of commitment from Scientific Advisors/ Mentors to serve as honorary advisors, Letter of intent of key members of the technical team, Letter of interest/intent from the incubator, Letter of Recommendation, Letter Of Recommendation From District Authority, Letter Of Support From State Government, License (For trade/business establishments), License From the Department Of Legal Metrology Previously (Department Of Weights & Measures), Linkages with Industries, List of Directors & their Share Holding, Memorandum of Article, Board Resolution (In case of Private Limited/Public Limited), List of documents to be submitted along with the application form, List of Employees Covered Under the Provident Fund Scheme Along with Wage/Salary Payment Particulars, List of equipment purchased for developing patent with justification and bills of the same, List of Governing Body/Board of Directors, List Of Labour/Employees, List of Members, Copy of Registration of Registration of Society, Resolution of Authorization, Name of Executive Body (In case of Trust), List of organizations with which formal MoUs/linkages exist, List Of Participating Artisans (Minimum 25), List of Patents Filed/Granted, List of publications, List of required documents list, List of the required document, List of the required documents, Loan Account Classification Certificate (confirming Non-Performing Asset status), Loan Application, Loan Application Form, Loan Closure Document, Loan documents, Loan Repayment Statement, Loan Statement, Loan-Related Documents, Loan-related proofs, Localisation plan, Machinery and Equipment Documents, Machinery Details, Machinery Invoices, Machinery should bear the Machine Identification Code (MIC) issued by Textile Commissioner, Madhya Pradesh Native Certificate, Mandatory Chartered Accountant (CA) Certificates, Mandatory Furnishing Of Details Asked For In The Application At Page Numbers 12, 13, 14, And 15 To Prepare The Appraisal Report, Manpower details, Manufacturer’s authorization certificate (if purchased via authorized agent or stockist), Manufacturing Process Details With Flow Chart (For Loans Above ₹10,00,000/-), Manufacturing process flowchart, Marketing Documents, Marksheet for Passing Out of Annual Examination, Matriculation certificate (in which date of birth is mentioned), Matriculation Certificate for Date of Birth, Means of Finance/Funding pattern of the project, Medical Certificate, if applicable, Member’s share capital collected by sugar co-operative society (including the last balance sheet of the society), Membership details of coir artisans, Memorandum & Articles of Association (Submitted to ROC), Memorandum And Articles Of Association (In Case Of Private Limited Company), Memorandum And Articles of Association (MOA/AOA), Memorandum And Articles Of Association / Registration Documents, Memorandum And Articles Of Association In The Case Of Private Limited Company (For Loans Above ₹10,00,000/-), Memorandum and articles of association of the Company / Partnership Deed of partners etc, Memorandum and Articles of Association of the company/Partnership Deed of Partners etc, Memorandum and Articles of Association of the SPV, Memorandum and Articles of Associations of Private Sector/SPV, Memorandum Of Association Or Trust Deed, Micro Small Medium Enterprise Registration Certificate, Minority Community Certificate, MNREGA Card, Mobile Number of the Applicant, Month-wise Interest Paid Statement from the Finance Institution/Bank Along with No-due Certificate, Monthly family income details should be included (monthly income should be less than 50000), Municipal / Panchayat Permission, NA permission (if applicable), Name of supplier / details of machinery / price of machinery and / or items to be purchased, National Food Security Card is in force, NCDC may prescribe the requirements of documents to be obtained form the agency as per the nature and size of the project, Necessary Documents Regarding The Ownership Of The Land On Which The Furnace Is To Be Built, Need for conducting courses, No due Certificate from Previous Bank (in case of Take-over of Term Loan), No Dues Certificate (if previously assisted), No financial assistance has been received from any other source for the same purpose, No Objection Certificate (NOC)/Endorsement letter from the head of the institution (present organization), Non-Agricultural Land Conversion Certificate, Non-deposit certificate, Non-Encumbrance Certificate From Local Revenue Officials, Notarized Bahedhari Patrak, Notarized Guarantee On A Stamp Paper Of ₹300/- (For Group Applications) Stating That The Energy Saving Furnace Will Be Used In The Group, O&M Plan, Objective for the startup or innovation, Official details regarding sanctioned project loan, Official documents regarding the ownership of the land of the proposed project of the Sugar Co-operative Society, Organization Registration Proof (for SHGs/Clusters), Original Bills for Idols Sold, Original Copy of the Catalogue/Printing Material Prepared for Exhibition/Trade Fair, Original Documents Of All Submitted Certificates (For Verification As And When Required), Original Documents Of Copies Of Certificates Submitted By The Applicants (When Required By The Institute For Verification), Original Enlistment Certificate issued by NSIC, Original Proof of Payment *, Original Receipts, Bills, Railway Receipts, and Payment Vouchers, Original Title Deeds in the Name of the Party, Original Title Deeds, Antecedent Title Deeds, and Encumbrance Certificate for 30 Years for Collateral Security Property, Other details if any, Other details like Achievement, Award, Certification, Other Documents / Undertakings, Other Registrations Document, Other relevant document, Other relevant documents, Other requisite details, Other statutory approvals/ clearances / licenses, Overview of Manufacturing Process along with Key Raw Materials, Ownership Certificate of the building if applicable, PAN Number and a copy of the latest Income Tax Returns filed (In case the applicant is an Income Tax Payer), Parivar Pehchan Patra (PPP ID), Particulars or constitution of the applicant/ patent holder, Particulars to be Submitted after getting Sanction of Loan, Particulars To Be Submitted At The Time Of Filing Loan Application, Particulars To Be Submitted Either During Processing Time Or After Sanction Of Loan, Partnership Deed, General Power of Attorney as per Annexure A(1) (In case of Partnership Concern), Passbook of Bank or Post Office, Passport, Passport-size Photos, Patent (if Applicable), Patent certificate of technology (if applicable), Patta of the Said Property, Payment Details made to the local employees over the period of last one year, Payment Proof, Payment Proof for Employees' Provident Fund and Employees' State Insurance (With Number of Employees), Payment receipts of fees paid to patent office, Permanent Registration or Acknowledgment with Entrepreneurs Memorandum II from the Directorate of Industries, Trade and Commerce, Permission/Leave Letter For Construction Permission From The Gram Panchayat/Municipality/Competent Authority, Phone Details, Photocopies of lease deeds/ title deeds of all the properties being offered as primary and collateral securities, Physical Report On Site In The Prescribed Format (Annexure E-1), PIPDIC Entrepreneural Guidance, Pitch presentation with the following details, Plan & cost of the building certified by the Assistant Engineer (Civil) (Annexure-II), Plan Approval from the Pollution Control Board (PPA), Plan Report for Proposed Project, Police Complaint (FIR) (for accidents, if applicable), Pollution Certificate From Goa State Pollution Control Board, Post Expert Selection Panel (ESC), Post-Application/Disbursement Stage Documents (Required for existing CMRY/VKRY beneficiaries to qualify), Post-dated cheques for repayment as security towards the amount sanctioned (in case of approval), Post-Mortem Report, if applicable, Power of attorney / Board Resolution of Authorized Signatory/consent letter, Power of attorney/ Board resolution letter/consent letter, Power of Attorney/Board Resolution Letter/Consent Letter, Pre-feasibility report, Premises Documents, Presently information related to outstanding loan running on the applicant (if any), Previous Loan Details (if applicable), Printed Copy of application form with declaration signed by authorized person describing his/her designation and name with stamp of enterprise, Prior Approval of the Director of Industries and Commerce for Participation in the Exhibition/Trade Fair, Problem statement, Production Details of the Last Year (including number of pieces/meters and total weaving wages earned), Profession Certificate/Skill Test Certificate (issued by the Technical section committee of the Corporation), Profile Of Chairman / President / Promoter / Director / Vice Chancellor, Profile of Directors, Profile of Potential User, Profile Sheet Of The Applicant, Profitability Statement Detailing Monthly Sales, Income, and Expenditure Details (For Loans Up to ₹10,00,000/-), Profitability Statement Detailing Monthly Sales/Income and Expenditure, Project and Technical Documents, Project Cost (Annexure-B, Annexure- C, Annexure-D), Project Experience Certificates, Project Proposal, Project Proposal (For Specific Assistance), Project Proposal or Requirement List (tools, machinery, raw materials, etc.), Project proposal or work-shed details (if required), Project repot of the activity intended to be financed, Projected balance sheets for the next two years in case of working capital limits and for the period of the loan in case of term loan, Promoter Contribution Proof, Promoter Details And PAN Copies, Proof for Connected Load i.e., EB Meter Card/Online Statement, Proof For Sale Price Of End Product From The Existing Manufacture / Dealer, Proof For Sale Price Of End Product From The Existing Manufacture / Dealer (For Loans Above ₹10,00,000/-), Proof For Sale Price Of End Product From The Existing Manufacture Or Dealer, Proof of Address of Applicant (Voter ID / Passport/Driving Licence) (If available), Proof of Address of the President/Secretary (Voter ID / Passport / Driving License), Proof Of Age (To Verify Age Is Between 18 And 50 Years), Proof of age- to be supported with any proof and mandatory only in case applying for assistance for young entrepreneurs, Proof of age, if applicable, Proof of Age/DOB, Proof of agricultural occupation (For handloom and other non-farm sector activities) (if applicable), Proof of annual income, Proof of artisan/craft trade, Proof of being a Handloom or Handicraft artisan (for Applicant), Proof of being a Handloom/ Khadi Weaver, Proof of being a Roadside Cobbler (issued by the Gram Panchayat), Proof Of Birth And Residency For 15 Years In Goa (For Preference Claims), Proof of Business Address, Proof of Commercial Production Date, Proof of Details of Expenditure Incurred for Listing in Exchange [certified by Chartered Accountant], Proof Of Direct Involvement In Pottery Business/Work, Proof of disbursement of the term loan, Proof of Educational Qualification, Proof of Educational Qualifications, Proof of Eligibility, Proof of enrolment in the State portal for artisans & weavers, Proof of Grower's Registration, Proof of Identity, Proof of Identity and Address, Proof of identity and residence, Proof of income, Proof Of Investment, Proof of Land Ownership, Proof of Land Ownership in One of the Following Forms, Proof of Land Ownership in the form of any one of the following, Proof Of Loan Disbursement, Proof of merit, Proof Of Minimum 7th Standard Passed, Proof of new investment, if any, Proof of NGOs registered in the Darpan Portal of NITI Aayog, Proof of Occupation, Proof of Participation in Exhibitions, Proof of participation in National / International handicraft exhibitions/fairs, Proof Of Passing Graduation Or 12th Standard Or 10th Standard Or Schooling From The State Of Goa (For Preference Claims), Proof of Payment, Proof of payment (30% of allotment price), Proof of Prior Experience in Bio-Services or Biomanufacturing, Proof of Registration (Khadi Institution/Organization), Proof of Registration as an Artisan/Unit Industrialist from Puducherry, Proof of Registration with GHRSSIDC, Proof of regular Commercial Production (Recent Sale Bill), Proof Of Residency In Goa For At Least 15 Years Prior To The Application, Proof of Resident, Proof of rural residence, Proof of Sale of Idols (e.g., buyer receipts or invoices), Proof Of Self-Help Group Registration (In Case Of Self-Help Groups Of Women/Disabled Persons), Proof Of Stake Holding Of Scheduled Caste, Scheduled Tribe, Or Woman Partner/Promoter (In Case Of Seeking Additional Benefit Under These Categories), Proof of startup registration (Startup India or equivalent), Proof of technological capability (if ESDM revenue threshold not met) — any one of, Proof of Training(s) Received (if any), Proof of Turnover (Not exceeding ₹6,00,00,000 per annum for the last preceding 3 financial years), Proof of unit establishment in the Union Territory of Puducherry, Proof of verification of certification (online.), Proof of vocational training, if any, Proof of Women Ownership (51% stake), Proof reg. Latest Educational Qualification, Proof regarding the Applicant's Occupation, Proof that the applicant is not a defaulter in any Bank / Financial Institution, Property and Collateral Documents (For Mortgaged Property), Property and Legal Documents (For Collateral Security), Property and Premises Documents, Property Documents (For Collateral Security), Proposal in prescribed proforma, Proposal submission letter, Proposed cost of project and means of finance for technology to be acquired, Proposed courses details (Annexure-A), Proposed Curriculum, Proposed training center infrastructure photos/lay out/map, Proprietary Identity Document, Provide information on Licenses, permits and thirdparty approvals necessary to execute the project as per format attached here with, Provident Fund Remittance for the Claiming Period, Provisional Eligibility Certificate issued under the Scheme (If Applicable), Public Issue Prospectus or Boucher, Puducherry Planning Authority Approval (PPA Approval) (Required For Loans Above ₹10,00,000/-), Purchase bill, Sale bill, and Electricity Bill for Last month of Claim Period, Purchase invoice(s) of benchmarked machinery (must show commercial invoice date), Purchase Invoices for Charkha/Loom, Purchase Invoices for Plant & Machinery/ Pollution Equipment/ Generator, Purchase Register allotted by GHRSSIDC, Quality Certificates, Quarterly Review Reports (QRRs), Raw material procurement strategy, Raw Material Purchase Bills For Maida For The Previous 6 Months (From 1st April 2012 to 30th September 2012), Receipt for Payment to the Energy/Water Institution/Agency, Receipt for Payment to the Exhibition Organiser for Rent/Space, Receipt for Payment to the Patent Attorney (if Applicable), Receipt for Payment to the Quality Certifying Agency (if Applicable), Receipt for the Payment to the Energy/Water Institution/Agency, Receipt for the Payment to the Exhibition Organiser for Rent/Space, Receipt for the Payment to the Exhibition Organizer for Rent/Space, Receipt for the Payment to the Patent Attorney (if Applicable), Receipt for the Payment to the Quality Certifying Agency (if Applicable), Receipt for the Payment to the Technology-Providing Institution/Agency, Receipt Of Application Form Cost Of ₹25/-, Receipt of fees paid for enrolling and participating in the acceleration program, Receipt of fees paid for participating in the training program, Receipt Of Processing Fee Of ₹200/- (Non-Refundable), Receipts for Electricity Charges, Receipts of Rent Payment, Receipts of Sales Tax Returns, Recognition/Accreditation for Energy/Water Auditing Institution/Consultant (if Applicable), Recommendation From All Goa Bakers Association, Recommendation letter from a Nodal Institution, Recommendation Letter from Controlling Authority, Recommendation letter from the approved Nodal Institution, Recommendation letter of Field office/Regional Office, Recommendation letter of the financial institution (Annexure - IV) in original, Records of Idols Produced and Sold (Proforma-B), Registered Entities, Registered Lease / Mortgage / Sale Deed, Registered Lease Agreement for the Building Executed Between the Developer and the Unit, Registered Sale / Lease / Mortgage Deed, Registration and Compliance Certificates under Drugs and Cosmetics Act, Registration and Constitution Documents, Registration and Identity Proofs, Registration Card (Handicrafts & Handloom Department, Govt. of Jammu & Kashmir) (if registered), Registration Card/Certificate of the parent (Handicrafts and Handloom Department, Govt. of Jammy and Kashmir), Registration certificate (For industrial cooperative society), Registration certificate in case of the industrial cooperative society, Registration Certificate of Agency, Registration Certificate Of Enterprise / Skill University, Registration Certificate of Membership with Export Promotion Council / Federation of Indian Export Organisation (FIEO), Registration Certificate of Membership with Export Promotion Council / Federation of Indian Export Organization (FIEO), Registration certificate of the applicant Private Sector/SPV, Registration Certificate of the SPV, Registration detail of the applicant Organization, Registration Details With the Directorate of Industries, Trade and Commerce, Registration number registered at the District Employment Center, Registration Proof, Registration proof as a startup/innovator, Registration Proof of Cooperative/Institution, Registration proof under the Co-operative Act or relevant Societies Act, Registration Stage, Registration with State Textile Department (if required), Registration/Recognition certificate of the University/Institution, Regulatory Clearances. (If Applicable), Regulatory Treatment, Relevant certificates or recognitions, if any, Relevant certificates/documents confirming adherence to the eligibility criteria, Rent agreement, Rent Agreement (if business premises on rent) and clearance from pollution control board if applicable, Request for Joint Inspection Team (JIT) visit after installation, Request letter to ULB, Requisition Letter (No formal application form is required), Residence-cum-Nativity Certificate, issued by the competent authority, Residential Proof Document, Resume, Revenue projections for the next 3-5 years, Revised Check-List for Renewal of Registration, Revival Plan Approval for Sick Units (if Applicable), Rough sketch of the replanted blocks/area duly signed by the applicant. The plant count in each block along with the number of rows/columns should be recorded, Safai Karamchari or Dependent of Safai Karamchari Certificate issued by competent authority, Safai Karamchari or dependent of Safai Karamchari Certificate issued by the competent authority, Salary Slips of Concerned Employees*, Sales achieved during the current financial year up to the date of submission of application, Sales Invoices With Product Details, Sales projections document, Sanction order of Bank for Working Capital Loan if any, SC certificate issued by the competent authority, Scheduled of the land, Scheme-Specific Documents, Security Documents, Self Attested Copy Of Scheduled Caste/Scheduled Tribe Certificate Issued By The Competent Authority (If Applicable), Self Certification of Expenditure (For Master Trainers and Designers), Self certification on fixed assets as per Annexure-I, Self-Attestation regarding non-availing of interest subsidy under any other scheme, Self-Attested Copies Of All Relevant Documents (For The Purpose Of Verifying Substantial Expansion), Self-attested copies of sales bills, Self-attested copy of Acknowledgement of EM (EM part I in case of an application for Start-up support and part II for other assistance), Self-attested copy of audited balanced sheet with trade & profit loss statement and details of FCI, Self-attested copy of Challan/receipt towards payment of fees, Self-attested copy of consumer card of KSEB showing Contract demand and date of power connection with a copy of the last electricity bill, Self-attested copy of G.P. Registration Certificate, Self-attested copy of order and proof of payment of consultancy/technology transfer costs, Self-attested copy of registration certificate from Registrar of Company/Firm/Society of units other than proprietary, Self-Attested Copy of the Certificate of Handicrafts Award bestowed by the Central/State Government, Self-attested copy of the identity card of the applicant, Self-attested copy of the partnership deed/Memorandum and Articles of Association/Bye-laws in case of units other than proprietary, Self-attested copy of the registration certificate from Registrar of Company/Firm/Society of units other than proprietary, Self-attested copy of the resolution towards applying for this assistance in case of a unit other than proprietary, Self-attested copy of the Weavers Identity Card or certificate that he is a bonafide weaver or ancillary worker, Self-attested copy of valid licence from local body, Self-attested copy of, partnership deed/Memorandum and Articles of Association/Bylaws in case of units other than proprietary, Self-attested declaration certificate for Registered Entity Download, Self-Attested Documents/Details Submitted by the Authorized Person, Self-Attested documents/details to be submitted by the Authorized Person, Self-attested statement on land availability Download, Self-Certificate that the applicant is not blacklisted by any Government Department, Self-Certification, Self-Certification on, Self-Certification on Revenue/ Investment/ Net worth from each of the Group Companies whose credentials have been considered, Self-Certification on Revenue/ Investment/ Net worth from each of the Group Company (ies) whose credentials have been considered, Self-Certified Copies Of Bills Of Purchase From Local Sources, Self-Certified Copies of Shipping Bill, Bill of Export, Bill of Lading, Airway Bill, Postal Receipt, Excise Gate Pass, or Commercial Invoice Cum Packing List, Self-certified expenditure statement supported by DISCOM Documents, Self-certified list of Existing Plant & Machinery with its original purchase value and depreciated value, Self-Certified Shareholding Pattern, Self-certified statement of consolidated global ESDM or manufacturing revenue for FY 2023–24, Self-Certified Statement on Expenditure Incurred for Energy Audit with Copy of the Bills/Vouchers and Receipt, etc, Self-Prepared Plan and Estimation for Water Storage Tank / Open Well / Ring Well, Self-prepared work completion report and fund utilization certificate signed by the applicant, Service Certificate (To substantiate that the left-over service is equivalent to the loan repayment period), Service Tax Number (If Applicable), Settlement Register Copy of the Said Property, SGST Paid Challans / Returns, Share Subscription Agreements Between the Special Purpose Vehicle and Its Members, Shareholders Agreement of the SPV, Shareholding Pattern Certificate, Shareholding Pattern Document. (For Startups, Small and Medium Enterprises, and Industries), SHG Membership / Resolution, SHG records, SHG/JLG Certificate, Shop & Establishment Certificate (for service sector enterprises in municipal corporations), Short introduction about the project proposing institution, Sign & Stamp at each page, Signature of the applicant, Signed Copy of Application, Since the loan limit for this scheme can go up to ₹150,00,000, the document requirements listed below correspond to the checklist for loans Above ₹25,00,000, Site and Factory Building Plan with Machinery Layout and Civil Estimate (2 Copies) (For Loans Above ₹10,00,000/-), Site and Factory Building Plan with Machinery Layout and Civil Estimate (For Loans Above ₹10,00,000/-), Site And Factory Building Plan With Machinery Layout And Civil Estimate (Two Copies) (For Loans Above ₹10,00,000/-), Site Map And Google Map (To Be Attached With The Physical Report On Site), Sketch map of the land/ building purchased, Sketch map of the land/building purchased, Skill Certificates (If Available), Skill Development Training Certificate if applicable, SME Exchange Listing Letter (from BSE/NSE/SME Exchange), Soft copy of application in CD/DVD, Special Purpose Vehicle (SPV) Incorporation Documents, Specific Documents for Hinterland Eco Tourism Applications, SPV incorporation documents, SSI / MSME registration (if applicable), Stakeholder Validation Documents, Stamp Duty Paid Receipt, State Government proposal / land identification, Statement from bank, Statement of accounts (for the last six months), from the existing banker, if any, Statement of Expenditure, Statement of Expenditure and Utilization Certificate, Statement showing the Results of Operation for the last 3 years duly signed by the Chartered Accountant by indicating UDIN. (Annexure ‘C’), Status of Jute Mill Company or Micro, Small and Medium Enterprise Unit, Statutory Auditor / Company Secretary Certificate showing Shareholding Pattern (indicating number of shares and investment), Step 1, Step 2, Step 3, Submit consent of the concerned institutions for contribution to the project as per the means of finance proposed in the application form, Supporting Documents regarding the Type of Institution (Central/State Govt. Recognized/Funded Institution), Sustainability Business Plan, SVAYEM Scheme 2023 Application form, Target market and customers, Taxation Registration Document, Taxpayer Identification Number (TIN) Document, Tea Plantation or Manufacturing Unit Registration Documents, Technical and Financial Proposal Documents, Technical feasibility/ product testing report/certification (if any), Techno-economic viability assessment, Technology provider report, Technology transfer agreement, Tentative action plan for the next 3-5 years, Tentative capital equipment list, Term loan account statement from the lending agency, That he/she has not been convicted of any criminal offence, that he/she is not in receipt of any other similar financial assistance/pension from the State or Central Government, The declaration should include the followings, The file type should be PDF (.pdf). The file size should be less than 200 kb, The following list of Documents are to be submitted/ uploaded along with the application form, The following non-mandatory documents are desirable to be attached to the application form, Third-party assessment report from a recognized Chartered Engineer/ technical valuer for equipment/ machines to be installed, Three years Balance Sheet & audited statement of accounts, Tie-Up Letters For Marketing The Product, Title Deed of Land/ Land Tax Receipt if applicable, Title deed of land/land tax receipt if applicable, To be submitted in first claim only, Total Annual Fee/Charges of Course, Trade license, if any, Training Certificate (of beneficiary), Training Certificate, if available, Training Certificates (if applicable, for professional qualifications), Two-year-old valid Driving Licence in case of vehicle loan, Type of business/occupation, Udhyam Registration (For MSME projects and not for core Agri projects), UID and i-TUFS Portal, Unique IES Identification Number (DGFT portal), Up to Date Tax Paid Receipt (Latest Tax Paid Receipt) (Original), Upon Joining, Upon Shortlisting, USP/Uniqueness of the product/service, Utilisation Certificate (for release of balance subsidy), Utilization Certificate & Statement of Expenses (UC & SE), Utilization Certificates (For Fund Release), Utilization Certification in GFR 12A duly verified/certified by Chartered Accountant with membership No. and countersigned by Implementing Agency, Valid CCA obtained from GPCB (if applicable), Valid certificate for Ex-Serviceman /Differently abled /Transgender, Valid Insurance Policy for Fixed Assets, Valid Registration Certificate, Valuation Certificate (Obtained From Approved Panel Valuer Of Pondicherry Industrial Promotion Development And Investment Corporation Limited), Valuation Certificate of the Property Assessed by a Chartered Engineer from the Approved Panel of the Corporation (Original), Valuation Certificate of the Said Property (Original), Valuation Certificate, FMB Copy, Patta Copy, and Legal Opinion Report for Collateral Security Property, Valuation of Approved Civil Engineer/ chartered Engineer for civil construction, Valuation of approved Engineer, Chattered Engineer for Civil Construction, Vehicle Documents, Vehicle Related Documents, Vendor ID, Verification from Primary Weaver Cooperative Society confirming parent's membership, Verification report (Gist of expenditure) with the mode of payment from concerned Asst. Director, Handicrafts Service Centre/Field formation, Verified Photocopy of Marksheet of the Qualifying Board Examination, VF-7 (Gaam Namuna No. 7) of Survey No. for Land in which Project to be developed, Village Map of Land in which Industrial Park to be developed (with Highlighted Survey/Block Nos.), Village Map of Land in which Project to be developed, VO Recommendation, Voter ID, Weaver's Identity Card (Attested Copy), Weaver/Worker Pehchan Card Number (Enclose Copy), Webcam Recording in a Pen Drive, Women-led Certification (if Applicable), Work completion report and expenditure statement signed by the applicant, Work Planned, Working Experience Certificate for 2 to 3 years, Yarn passbook, Year-Wise Production Capacity till Project Completion, Financial feasibility report / certification (if any), Pitch presentation with following details, Technical feasibility/ product testing report / certification (if any). Gathering them once serves every application.
Apply to the schemes recorded against this opportunity
344 schemes on record. 14 of them carry credit-guarantee cover — name it in the application if you have no collateral to pledge.
Line up the licences and clearances the unit needs
Trade licence — Local municipal body (Before opening). These are indicative — confirm each one with the authority named against it before you rely on it.
Not mapped yet: After the loan · Once you're producing · Once you're selling · When you expand.
These phases are an order, not a schedule. The corpus carries no approval times, processing windows or dates, so nothing here tells you how long a step takes — only what comes before what. Phases listed as unknown have no supporting data yet, so they are left empty rather than filled in with a guess.
We could score 4 things. 6 are still unknown.
Scored on 4 of 10 dimensions — ease, demand, risk, scalability, time to revenue and compliance data is not in the corpus. The 90% is of the 40 points those 4 dimensions carry, not out of 100.